I have to admit that my work is not going very fast.
Have now been waiting for the left heaterchannel from
Mexico for over two months. Here is the result of some
welding at the right channel. I am pretty satisfied with
the result. Now its time for lifting the body of the chassis
and get wolfparts installed at the bottom.
No comments:
Post a Comment